NEWS

CJSC Poultry Farm “Orel-Leader”

Cogeneration station construction at CJSC Poultry Farm “Orel-Leader”, Dneproptrovskaya oblast

Cogeneration station is devoted for combined generation of electric and heat energy. It is made on the basis of two stations, completed with gas reciprocating engines and generators, heat exchange systems, electric power distribution, automation and auxiliary equipment.

The station electric capacity is 3 MW, the heat capacity is 3,5 MW. The operation regime is completely automated.