NEWS

OJSC “Shostka Dairy”

Increase of heat generation and transfer at OJSC “Shostka Dairy”

The complete heat supply system reconstruction was achieved due to construction of new steam boiler plant for the technological needs of the enterprise (2 boilers, 5 t/hour each one), as well as the construction of new water heating boiler plant for the heat supply of residential apartment block (2 boilers of 495 and 270 kW) and replacement of distribution nets. The old boiler plant was removed of service.